Types of construction
The term ‘construction’ refers to the process of building something such as a house, bridge, tunnel and so on. This may involve new developments, alterations to existing developments, demolition and other activities carried out by building contractors.
There are many different ways of classifying types of construction, including:
- Purpose (demolition, rebuilding, alterations of or additions etc). For more information see: Construction
- Sector (civil engineering, commercial, residential, healthcare etc).
- Structure (timber frame, masonry, fabric structure etc). For more information see: Types of structure.
- Element (wall, roof, tunnel, foundation etc).
- Type of building (dwelling, office, skyscraper etc). For more information see: Types of building.
- Type of contractor (self build, management contractor, construction manager etc). For more information see: Types of contractor.
- Construction technique (kit, modular, prefabricated, in-situ etc).
- Procurement route (design and build, traditional, measurement etc). For more information see: Procurement routes.
- Type of development (Crown build, build to rent, specualtive, bespoke, built to suit etc). For more information see: Types of development.
- Historic period (Roman, Greek, modern etc). For more information see: Style
- Style (brutalist, postmodern, classical etc). For more information see: Style
- Technology (smart, green, low-tech, hi-tech etc).
- Form of contract (JCT, FIDIC, NEC etc).
- Specialism (services, ICT, cladding etc).
- Funding (public, private, public private partnership etc).
- Performance (fire resisting, insulating, sound absorbing etc).
- Health and safety (notifiable, not notifiable).
- Client (experienced, inexperienced, repeat etc).
- Degree of complexity (simple, complex, bespoke etc).
[edit] Related articles on Designing Buildings
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.























